Latest YouTube Video

Tuesday, May 26, 2015

Neuer, Mueller, Kroos left out of Germany squad

FRANKFURT, Germany (AP) Goalkeeper Manuel Neuer, forward Thomas Mueller and midfielder Toni Kroos have been left out of Germany's squad for the upcoming friendly against the United States and the European Championship qualifier against Gibraltar.

from FOX Sports Digital http://ift.tt/1EuZrij
via IFTTT

Orioles: C Matt Wieters (recovering from elbow surgery) to begin rehab assignment Tuesday at Double-A Bowie (ESPN)

from ESPN http://ift.tt/1eW1vUH
via IFTTT

ISS Daily Summary Report – 05/21/2015

SpaceX-6 Dragon Departure:  Overnight, the crew disconnected both power jumpers, installed the Center Disk Cover, and closed Node 2 Nadir Hatch.  They then successfully depressurized and pressure checked the Node 2/Dragon vestibule.  Dragon was unberthed from the Node 2 Nadir docking port and subsequently released by the crew utilizing the Space Station Remote Manipulator System (SSRMS) at 6:04am CDT this morning.  Dragon splashdown was in the Pacific Ocean landing zone at 11:42am CDT. The Recovery team has Dragon safely on the recovery boat and they are heading to port. Fluids Integrated Rack (FIR) Advanced Colloids Experiment (ACE)-Microscopy-3 (M3):  Virts accessed the FIR Light Microscopy Module (LMM) and removed the Auxiliary Fluids Container (AFC) that housed the ACE-M3 sample.  He removed the sample and using the Binary Colloidal Alloy Test (BCAT)-3 magnet mixed the samples prior to returning the sample to the LMM.  ACE-M3 research involves the design and assembly of complex three-dimensional structures from small particles suspended within a fluid medium. These so-called self-assembled colloidal structures are vital to the design of advanced optical materials. In the microgravity environment, we will study the relation between particle shape, crystal symmetry and structure, a fundamental issue in condensed matter science. BCAT-Low Gravity Phase Kinetics Platform (KP) Intervelometer Change:  Cristoforetti changed the camera battery, transferred images to a laptop for ground controllers to downlink, and then set the D2Xs intervalometer.  The BCAT-KP experiment aims to help materials scientists develop new consumer products with unique properties and longer shelf lives. Colloids are mixtures of small particles distributed throughout a liquid, which include milk, detergents and liquid crystals. Gravity affects how the particles clump together and sink, making the International Space Station an ideal platform to study their fundamental behaviors. Columbus Solid State Drive Installation:  Kelly removed the two Columbus Video Cassette Recorders (VCR) from the starboard end cone then replaced them with two newer design Solid State Drive (SSD) recorders. The newer SSD recorders will provide additional recording capability without the use of Hi-8 tapes. During cable connection portion of the activity, the crew encountered issues with connector clearances. Ground teams are investigating the problem.   Today’s Planned Activities All activities were completed unless otherwise noted. Medical Ops OBT Dragon/Node 2 Vestibule Depress Morning Inspection. SM ПСС (Caution & Warning Panel) Test Reading Reminder for Fine Motor Skills Second FIR Rack Doors Open ACE – Sample Prep On-orbit hearing assessment using EARQ Columbus Stowage Items Relocation ACE – Sample Prep Video Monitor 1 (VMN1) Removal from Installation Location Fine Motor Skills – Experiment Ops Closing window shutters 6,8,9,12,13,14 Node 2 – Common Berthing Mechanism (CBM) Demate Crew Command Panel (CCP) Cable Route and Checkout Medical Kit Audit Installation of inserts to ease opening of SM interior panel locks – Preparation steps. Unstow kit with structural elements (004890R, ФГБ1ПГО_4_427_1, CTB No.1112 (004106J) Life On The Station Photo and Video Installation of inserts for easy opening of SM interior panel locks (panel 338) BCAT-D2XS – Battery Charge Initiation ACE – Sample Prep FIR Rack Door Close Installation of Camcorder in the LAB at LAB RWS 3 to monitor RWS commanding from the ground. Adjust LAB RWS monitor 3 to a maximum brightness to be able to see graphics via camcorder. RWS – Configuration WRS – Recycle Tank Fill Video Footage of Greetings Preparation for SSRMS Dragon Release from Node 2 Nadir SSRMS Dragon Release from Node 2 Nadir and Departure Monitoring Psychological Evaluation Program (WinSCAT) Medical Kit Audit Installation of inserts for easy opening of SM interior panel locks (panel 322) Life On The Station Photo and Video On-orbit Hearing Assessment using EARQ Transfer of two Video Cassette Recorders from Columbus BCAT – Battery Replacement and Photo Downlink Installation of new Solid State Drive (SSD) Gathering equipment to replace device РТ-50-1М No.10 (А210) RWS Teardown Crew Command Panel (CCP) Cable Routing Carrier Rack Rotation to gain access to VDPU Installation of inserts for easy opening of SM interior panel locks (panel 234) Carrier Rack Reconfig after VDPU Installation  – Assistance (Part 1) Installation of new VDPU IMS Delta File Prep Photo documentation of HRM harness ops Installation of inserts for easy opening of SM interior panel locks (panel 320) Video Downlink End VIZIR. Experiment Ops Carrier Rack Reconfig after VDPU Installation RWS Monitor Video Downlink to See Graphics via Camcorder Carrier Rack Reconfig after VDPU Installation – Assistance (Part 2) WRS – Recycle Tank Fill [Aborted] VMN1 Reinstallation Columbus Stowage Items Relocation VZAIMODEISTVIYE-2. Experiment Ops URISYS Hardware Setup CUCU Deactivation Completed Task List Items WHC-KTO-REPLACE Ground Activities All activities were completed unless otherwise noted. System commanding associated with Dragon departure Three-Day Look Ahead: Friday, 05/22: Ocular Health, EVA Loop Scrub, Biolab Microscope cassette removal Saturday, 05/23:  Weekly Cleaning, Crew Off Duty Sunday, 05/24: Crew Off Duty  QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) On [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

from ISS On-Orbit Status Report http://ift.tt/1F8aiz8
via IFTTT

I have a new follower on Twitter


Rachel
KidsRight to Know (Founder) Age15 Debated a Dragon http://t.co/pn1AzZFiCg Speaker TEDxToronto 2014 http://t.co/3OkImztLNH Huffington Post Blogger
http://ift.tt/1kG42qx
http://t.co/TCwDWL9Q1J
Following: 20431 - Followers: 30002

May 26, 2015 at 09:09AM via Twitter http://twitter.com/RachelsNews

ISS Daily Summary Report – 05/22/15

Ocular Health (OH): Virts and Cristoforetti completed their Return (R)-30 OH today.  They each performed ultrasounds of their eye with the assistance of the other crewmember acting as a Crew Medical Officer (CMO).  Virts, again with Cristoforetti as his CMO, performed an ultrasound echocardiogram. The Ocular Health protocol calls for a systematic gathering of physiological data to characterize the risk of microgravity-induced visual impairment/intracranial pressure in ISS crewmembers. Researchers believe that the measurement of visual, vascular and central nervous system changes over the course of this experiment and during the subsequent post-flight recovery will assist in the development of countermeasures, clinical monitoring strategies, and clinical practice guidelines. Biolab Microcassette Review: Cristoforetti removed the distribution and cleaning (D&C) cassette from the Biolab Microscope.  She then removed all syringes from the Biolab Automatic Ambient Stowage (AAS) Standard Insert and then installed it into the AAS compartment.  The Microcassette, containing data from the TripleLux-A experiment, will be returned on 41 Soyuz for ground specialists to analyze the data.  Triplelux-A uses a rat macrophage cell line to investigate and compare the ability of macrophages to kill pathogens under normal gravity and microgravity conditions.  The goal is to gain a better understanding of immune suppression in spaceflight. Extravehicular Mobility Unit (EMU) Loop Scrub:  Kelly configured EMU Suits 3005 and 3010 for today’s loop scrubbing activity. He then initiated the ionic and particulate filtration (scrubbing) and conducted biocidal maintenance (iodination) on EMU 3005 and Airlock cooling water loops. An issue was detected with cooling on EMU 3010, therefore scrubbing was not performed on that suit.  Water samples were obtained after the loop scrub activity to determine the effectiveness of the filtering.  A portion of this water sample will used for a conductivity test and the remaining water will be sent to the ground for chemical analysis. Ground Teams are investigating the cooling issue with EMU 3010.  Mobile Servicing System (MSS) Operations:  Robotics Ground Controllers powered up the MSS and walked the Space Station Remote Manipulator (SSRMS) off Node 2 Power Data Grapple Fixture (PDGF) onto the Lab PDGF. After completing the walk off, the Robotics Ground Controllers maneuvered the SSRMS to Node3 Forward survey start position and reconfigured both arms of Special Purpose Dexterous Manipulator (SPDM) in preparation of Permanent Multipurpose Module (PMM) relocation next Wednesday. MSS performance today was nominal. Wastewater Storage Tank Assembly (WSTA) Slow Fill Troubleshooting – Over the past few weeks, it has taken significantly longer than expected to transfer pretreated urine from an EDV to the WSTA.  Today the crew performed troubleshooting steps to attempt to correct the issue.  They first transferred pretreated urine using the Russian compressor to determine if the pressure supply is the cause of the slow transfer.  This had no effect on the transfer rate.  They then back-flowed pretreated urine from the WSTA into an EDV to attempt to clear any air bubbles or blockage that could be restricting flow through the filter of the EDV transfer hose.  A subsequent WSTA fill initially showed improvement for the first 5-10% of the fill but then returned to the prior slow fill rate.  Ground teams will continue to troubleshoot the issues.  International Docking Adapter (IDA)1 Control Panel Checkout:  Virts performed a checkout of the IDA1 Control Panel.  The IDA1 Control panel was installed earlier in the increment and will be used during the IDA1 install EVA, currently planned later this year.   Today’s Planned Activities All activities were completed unless otherwise noted. Biochemical Urine Test URISYS Hardware Stowage ISS crew and ГОГУ (RSA Flight Control Management Team) weekly conference ECLSS Recycle Tank Remove and Replace Fine Motor Skills – Experiment Ops CORRECTSIA. Logging Liquid and Food (Medication) Intake Replacing РТ-50-1М No.10 (А210) device with the new unit No.П3001010. Take pictures before and after replacement of device behind panel 129. (Dispose of the old No.93030030 (001839R) unit via Progress 425. Update the IMS). OTKLIK. Hardware Check Preparing for Photography of SM and DC1 Window Glass (Procedure and r/g review) Audit of Water Supply Equipment [СBО] in ПрК and FGB Ultrasound 2 Scan Photography of SM window 01,12 and DC1 EV2 glass and photo downlink Ultrasound 2 Data Export WRS – Recycle Tank Fill EMU cooling loop scrub. HMS. Ultrasound 2 – Post-Scanning Ops Biolab – Hardware Ops PROBOY. RSЕ1 Laptop Ops. Tagup with specialists PROBOY. Penetration Simulator Ops. Tagup with specialists CARDIAC Ops Demating РТ-50-1М TLM Connectors from БКС РТ-50-1М No.10 (А210) R&R. Tagup with specialists HMS. CARDIAC Ops, Operator EVA. Retrieval of EVA water sample adapter Partial drain of the UPA WSTA into EDV 960 to troubleshoot the WSTA slow fills Setup of N2 camcorder to downlink view of IDA Control Panel lights for ground assessment Node 2 Forward IDA Control Panel checkout prior to usage of ICP during IDA1 EVA Installation Biolab – Hardware Ops IMS Tagup (S-band) WRS – Recycle Tank Fill EMU cooling loop scrub Ultrasound 2 Power Down PAO hardware setup PAO Event During A Year Long Mission  ESA Weekly Crew Conference РТ-50-1М No.10 (А210) R&R. Tagup with specialists WRS – Recycle Tank Fill CORRECTSIA. Logging Liquid and Food (Medication) Intake PROBOY. Copy and Downlink Data Audit of Water Supply Equipment [СBО] in ПрК and FGB Biolab – Equipment setup for the experiment SLT Laptop Hard Drive Swap CMS – ARED Quarterly Maintenance VIZIR. Experiment Ops EMU – Cooling Loop Maintenance –  EMU Reconfig RGN REC-TNK – Removal of depress hose for nominal operations On MCC Go Mating РТ-50-1М TLM Connectors to БКС Health Maintenance System (HMS) – Food Frequency Questionnaire EMU – Long Dryout РТ-50-1М No.10 (А210) R&R – Closeout Ops. Take pictures after replacement of device behind panel 129. (Dispose of the old No.93030030 (001839R) unit via Progress 425. Update the IMS). Tagup with specialists WRS – Recycle Tank Fill IDENTIFIKATSIYA. Copy ИМУ-Ц micro-accelerometer data to laptop RGN – Initiate drain into EDV EMU cooling loop scrub. Biolab – Tool Stowage EHS – IV-TEPC Transfer IMS tagup WRM – Water Consumption Balance, place holder Russian Hardware Restow СОЖ Maintenance VZAIMODEISTVIYE-2. Experiment Ops Flight […]

from ISS On-Orbit Status Report http://ift.tt/1Kx7gvX
via IFTTT