Latest YouTube Video

Monday, March 7, 2016

ISS Daily Summary Report – 03/4/16

Space Headaches:  Peake completed his Weekly Space Headaches questionnaire today. Headaches can be a common complaint during spaceflight. The Space Headaches experiment will provide information that may help in the development of methods to alleviate associated symptoms and improvement the well-being and performance of crew members in space.   Space Acceleration Measurement System Sensor (SAMS)-II: Kopra moved the SAMS Sensor Enclosure from US Lab to the Japanese Experiment Module (JEM). SAMS-II is an ongoing study of the small forces (vibrations and accelerations) on the ISS resulting from the operation of hardware, crew activities, dockings, and maneuvering. Results generalize the types of vibrations affecting vibration-sensitive experiments. Investigators seek to better understand the vibration environment on the ISS.   Burning and Suppression of Solids (BASS): Kopra disconnected and stowed hardware used for the BASS investigation. BASS examined the burning and extinction characteristics of a wide variety of fuel samples in microgravity and is used to guide strategies for extinguishing accidental fires in microgravity. Its results contribute to the combustion computational models used in the design of fire detection and suppression systems in microgravity and on Earth.   Urine Processing Assembly (UPA) Status: Upon further investigation it was discovered that Quick Disconnect (QD)26 connected to the Pressure Control and Pump Assembly (PCPA) was not fully mated. The crew mated the QD, the pressure dropped and UPA was taken to Standby. A process cycle was initiated followed by a recurrence of DA belt slippage. The DA transitioned to Shutdown. The UPA will be allowed to cool down prioir to another attempt. ISS Reboost With 61 Progress (61P): A reboost is planned tonight at 10:15 PM CST using 61P thrusters. The reboost is to set up conditions for 46S 4-orbit rendezvous on March 19. Today’s Planned Activities All activities were completed unless otherwise noted. VIZIR. Battery Charge / r/g 1593 ISS crew and ГОГУ (RSA Flight Control Management Team) weekly conference / r/g 1581 SAMS: hardware transfer SPHERES – Battery Replacement Routine Maintenance of H2O valves [КН], Air Press Valves [КВ], and Drainage Valves [КД] in SM Rodnik Tanks Columbus ETC (COL1D4) Pivot Pin troubleshooting HMS Defibrillator Inspection SEISMOPROGNOZ. Downlink data from Control and Data Acquisition Module (МКСД) HDD (start) r/g 1595 Photo/TV Camcorder Setup Verification Dust Filter Replacement and В1, В2 Fan Grille Cleaning in DC1 Inspection of USB connector and PDH2 controller Dust Filters and Cleaning В1, B2 Fan Screens in MRM2 ARED Exercise PHOTO/VIDEO Stowage Dust Filter Replacement and MRM1 Gas-Liquid Heat Exchanger (ГЖТ) Cleaning Monthly Inspection of T2 Treadmill System VIZIR. End battery charge / r/g 1593 Water Recovery and Management (WRM) – Condensate Pumping Initiation VIZIR. Experiment Ops. Tagup with specialists / r/g 1601 ESA Weekly Crew Conference Food Frequency Questionnaire Terminate Condensate Pumping WHS) Pre-Treat Tank and Pre-Treat Tank Hose R&R QD Pressure Check [Aborted] SEISMOPROGNOZ. Download data from Control and Data Acquisition Module (МКСД) HDD (end) and start backup r/g 1595 VIZIR. Closeout Ops. Tagup with specialists / r/g 1601 СОЖ Maintenance SSC23 Power Activation. Respiratory Support Pack Checkout BASS – Removal and Stowage Consolidation of US Food Rations Verification of ИП-1 Flow Sensor Position Connecting 46S and FGB SSC Laptop wireless clients Closing USOS Window Shutters MSG power off Start EMU Metox Regeneration SHD – Weekly Questionnaire Closing covers on windows 6,8,9,12,13,14 r/g 6965   Completed Task List Items None   Ground Activities All activities are on schedule unless otherwise noted. ISS reboost   Three-Day Look Ahead: Saturday, 03/05: Crew Off Duty, Weekly Cleaning Sunday, 03/06: Crew Off Duty Monday, 03/07: C2V2, OASIS, SABL troubleshooting   QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Override Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

from ISS On-Orbit Status Report http://ift.tt/1paAVnd
via IFTTT

No comments: