Latest YouTube Video

Thursday, May 21, 2015

ISS Daily Summary Report – 05/20/15

Double Cold Bag (DCB) Packing:  Virts and Kelly packed the +4 degrees Celsius (°C) DCB with conditioned Ice Bricks and samples from Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI)-2 and -32°C DCBs with Ice Bricks and frozen samples from MELFI-3.  The +4°C DCB will be returning with Cell Shape and Expression, CASIS PCG-3, Nematode Muscles, and NanoRacks Module-53 samples.  The -32°C DCB will be returning with frozen HRP samples.  Once packed, the DCBs were placed in Dragon prior to hatch closure. SpaceX-6 Departure Preparations:  This morning, the crew completed final cargo loading. Later, they configured Dragon’s pressurized segment for departure and closed its hatch.  Once the Dragon hatch was closed, they configured the Node 2 vestibule by removing Air Revitalization System (ARS) and data jumpers then installed the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs). SpaceX-6 unberth activities are scheduled to start this evening at 11:30pm CDT and Dragon release at ~6:04am CDT Thursday morning utilizing the Space Station Remote Manipulator System (SSRMS). Node 3 Forward 2 Stowage Removal:  In preparation for Permanent Multipurpose Module (PMM) relocation next week, Virts removed stowage from the Node 3 Forward location. PMM relocation from Node 1 nadir to Node 3 forward is planned for Wednesday, May 27th.   Today’s Planned Activities All activities were completed unless otherwise noted. Dragon – Transfers Ops Rendezvous and Prox Ops Program (RPOP) –  Adjustment Anemometer Handover from USOS to RS Activity with IVA Tools СТТС Configuration for MRM1 Dragon Transfer Ops Preparing for measuring air flow using anemometer Velocicalc 9565 in MRM1 and on SM Power Supply System units. Tagup with specialists Velocicalc 9565 Anemometer Setup for Operation. Tagup with specialists WRS – Recycle Tank Fill Measuring air flow using anemometer Velocicalc 9565 in MRM1 and on SM Power Supply System units. Tagup with specialists Dragon Transfer Ops RELAKSATSIYA Hardware Setup CEVIS Exercise Crew Medical Officer (CMO) Proficiency Training Dragon Cargo Operations Conference RELAKSATSIYA Comm reconfig for nominal ops Makita Tool Battery Cycling – Hardware Prep СОЖ Maintenance RELAKSATSIYA Closeout Ops Makita battery pre-charge installation Dragon Transfer Ops Makita charge monitoring Anemometer Handover from RS to USOS WRS – Recycle Tank Fill Work Maintenance Area Setup in DC1. Transfer to DC1 and Activation of Orlan suit No.5.Tagup with DRAGON – Dragon Egress in Preparation for Departure Makita Tool battery discharge Dragon – Hatch Closure Dragon Vestibule Configuration for Demate Recovery of Measuring System ИК-0702М in Orlan Suit No. 5. Tagup with specialists Installation of Node 2 Nadir CBM Controller Panel Assembly (CPA) Water Supply Hardware Audit [СBО] Installation of Makita tool battery for charging Monitor Makita Tool battery charge Recovery of space suit No.4 left sleeve for nominal operations Powerup of Cupola and LAB Robotic Workstation (RWS) Display and Control Panel (DCP) Orlan Suit No.5 and No.4 Closeout Ops Installation of Camcorder in the LAB at LAB RWS 3 to monitor RWS commanding from the ground Closing USOS Window Shutters End Makita Tool battery charge, log charge time into the table, remove battery from the charger, stow equipment IDENTIFIKATSIYA. Copy ИМУ-Ц micro-accelerometer data to laptop БД-2 Exercise, Day 1 IMS Delta File Prep UDOD. Copy and Downlink Data CASKAD. Thermostat Deactivation and Equipment Transfer to [CA]  Ground Activities All activities were completed unless otherwise noted. Node 2 Nadir CBM Preparations for Demate Dragon Prop and GNC Equipment Checkout Starboard TRRJ Video Survey Three-Day Look Ahead: Thursday, 05/21: SSRMS walk off, Dragon N2 vestibule demate/depress, Dragon unberth/landing, ACE M-3 sample prep, COL stowage relocate Friday, 05/22: Ocular Health, EVA Loop Scrub, Biolab Microscope cassette removal Saturday, 05/23:  Weekly Cleaning, Crew Off Duty QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

from ISS On-Orbit Status Report http://ift.tt/1ei1tNx
via IFTTT

No comments: