Fluid Shifts: Fluid Shift operations continued today in the Russian Service Module (SM). Kelly was the first to don the Lower Body Negative Pressure (LBNP/Chibis) device while Kornienko, with ground support in Moscow, assisted with medical monitoring. While Kelly was subjected to the negative pressure (pulling the fluid toward the feet), Padalka, with remote guidance in Houston, performed arterial and venous measurements of the head and neck; cardiac, ophthalmic, and portal vein measurements; and tissue thickness of various body parts using the Human Research Facility (HRF) ultrasound. Following Kelly’s Chibis session, Kornienko then donned the Chibis and Padalka acted as the medical monitor with Kelly as the ultrasound operator. Following the scans, Kelly deconfigured the ultrasound and configured the Cerebral and Cochlear Fluid Pressure (CCFP) and Distortion Product Otoacoustic Emissions (DPOAE) for tomorrow’s operations. Human Research Program (HRP) Collections: Cristoforetti performed urine collections for her Return minus 15 (R-15) day Biochemical Profile, Cardio Ox, and Repository experiments. After collection, the samples were placed in Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) for return on a later flight. Advanced Colloids Experiment Heated-1 (ACE-H1) Configuration: Virts accessed the Fluids Integrated Rack (FIR) to swap the ACE-Microscopy-3 (M3) experiment to the ACE-H1 experiment. He removed ACE-M3, changed out cables and configured the Light Microscopy Module (LMM) for the next set of ACE-H1 runs (two planned and one contingency) including placing wipes and oil dispensers inside the LMM Auxiliary Fluids Container (AFC). The experiment examines densely packed microscopic spheres, or colloidal mixtures, to study their transition from ordered crystals into disordered glass. The particles are fluorescent and change size in different temperatures so scientists are able to see how they move and change forms as they are heated and cooled. Studying particle interactions without the influence of gravity improves scientists’ ability to understand how increasing disorder in a crystal material affects the freezing, melting, aging and structural integrity. Extravehicular Activity (EVA) Fan Pump Separator (FPS) Remove & Replace (R&R) Prep: In preparation for tomorrow’s and Thursday’s planned R&R of Extravehicular Mobility Unit (EMU) 3010 FPS, Cristoforetti gathered and staged tools required for the activity. Today’s Planned Activities All activities were completed unless otherwise noted. Fluid Shifts config Regeneration of БМП Ф2 Micropurification Cartridge (start) ARED video setup Fluid Shifts activation of Ultrasound equipment Fluid Shifts scan – operator Fluid Shifts Chibis Replace battery pack in CDM Configure CDM to record data by clearing Data Logger prior to use Set up and activate CDM, then don CDM for CDM Crew Work Day Worn session Chibis don Fluid Shifts scan – subject Chibis doff Fluid Shifts photos MELFI 3 Ice Brick Insert 2 Synthetic Muscle Historical Documentation Photography HRF Generic Urine Collection Subject HRF Generic Sample MELFI Retrieve And Insertion Operations EHS – Formaldehyde Monitoring Kit (FMK) Deployment Operations at LAB location EHS GSF sampling Fluid Shifts Ultrasound Service Module Preparation Fluid Shifts Ultrasound Service Module Scan Operator Fluid Shifts Ultrasound Service Module Stow Fluid Shifts HRF PC And CCFP Service Module Setup Thermal Container Chamber Closeout MSPR Components Deactivation Fluids Integrated Rack Rack Doors Open ACE-H1 Cable Configuration ACE-H1 Hardware Configuration РК4 Installation of Video Monitor and Connecting it to Converter via cable EHS Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis EVA EMU 3010 FPS R&R Tool Gather FLUID SHIFTS. Disconnection & disassembly PK-4 Video Monitor checkout РК-4 Starting Pressurization and Pressure Checkout of Vozdukh Atmosphere Purification System [СОА] using Control Panel Rodent Research MELFI Retrieve Rodent Research Habitat Restock 1 Video Footage for Nauka 2.0 TV Channel Water Refill Kit Review JEM System Laptop Terminal Reboot HRF Generic Urine Collection Subject HRF Generic Frozen Blood Collection Setup Transfer Operations – Prepack of US items for return on 41S Water Refill Kit Habitat H2O Fill RGN Recycle Tank Fill Completed Task List Items None Ground Activities All activities were completed unless otherwise noted. High Beta configuration Three-Day Look Ahead: Wednesday, 06/03: FPS R&R Part 1, HAPTICS-2 PROTOCOL1B Ops, Fluid Shifts Thursday, 06/04: FPS R&R Part 2, Fluid Shifts Friday, 06/05: PMM cleanup, EVA FPS pack for return QUICK ISS Status – Environmental Control Group: Component Status Elektron Off Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Process Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up
from ISS On-Orbit Status Report http://ift.tt/1AKBp88
via IFTTT
No comments:
Post a Comment