Latest YouTube Video

Wednesday, June 10, 2015

ISS Daily Summary Report – 06/09/15

ISS Attitude Control Disturbance:  ISS experienced unexplained torque around 15:27 GMT in the roll axis.  The attitude control system experienced a large number of desats with a continued increase in attitude error.  SARJs were safed and attitude control was handed over to RS thrusters. Preliminary indications seem to point to an approximate 38-second inadvertent 41S thruster firing following a scheduled Kurs checkout in preparation for 41S undocking.  MCC-M performed realtime commanding to stop the thruster firing.  ISS attitude control has been handed back over to the USOS and the ISS is in a stable attitude.  All ISS and Soyuz systems are operating nominally at this time.  Human Research Program (HRP) Collections: Kelly and Cristoforetti continued their collections today with Kelly performing a blood draw to support the Biochemical Profile, Cardio Ox, and Twins Study experiments.  The blood collected was inserted into Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI).  Both Kelly and Cristoforetti performed saliva collections for Microbiome and Salivary Markers, and Kelly collected for Twins Study.  Defining the Relation Between Biomarkers of Oxidative and Inflammatory Stress and Atherosclerosis Risk in Astronauts During and After Long-duration Spaceflight (Cardio Ox): Kelly, with Cristoforetti as the Crew Medical Officer (CMO) and remote guidance support from the ground, performed the Flight Day 60 (FD60) ultrasound scans for Cardio Ox followed by blood pressure measurements and logging results. The objective of Cardio Ox is to determine whether biological markers of oxidative and inflammatory stress are elevated during and after space flight and whether this results in an increased, long-term risk of atherosclerosis in astronauts. Crew members provide blood and urine samples to assess biomarkers before launch, three sessions while in space, and again post-flight. Ultrasound scans of the carotid and brachial arteries will be obtained at the same time points, as well as through 5 years after landing as an indicator of cardiovascular health. Extravehicular Mobility Unit (EMU) Return To Service (RTS): Following last week’s EMU 3010 Fan Pump Separator (FPS) replacement, Virts performed a checkout of EMU 3010 today, initial results of the checkout were nominal. Crew Quarters (CQ) Deck Cleaning: In preparation for her departure from the ISS, Cristoforetti cleaned her CQ including intake and exhaust ducts, fans and airflow sensors. Space Station Remote Manipulator System (SSRMS) Operations:  Robotics Ground Controllers maneuvered the SSRMS to grapple the Node 2 Power and Data Grapple Fixture (PDGF).  The SSRMS base was then changed to Node 2, and the Lab PDGF was released.  The SSRMS cameras were then used to perform a survey of the external configuration of the Russian Segment.  Finally, the SSRMS was moved to a park position.  MSS performance was nominal.  Today’s Planned Activities All activities were completed unless otherwise noted. TWIN – Saliva Sample Collection PARODONT-2. Activities with Microbial Control and Mouthwash sets HRF Blood Draw and Stow Prep TWIN – Saliva Sample Collection HRF – Sample MELFI Insertion HRF Blood Draw HRF Blood Sample Collection (operator) HRF Refrigerated Centrifuge Configuration Verification of anti-virus scan results on Auxiliary Computer System (ВКС) laptops EMU Post-FPS R&R Tool Stowage HRF – Blood Sample Collection Closeout Ops PROBOY. Activity with RSЕ1 Station laptop. PROBOY. Activity with Penetration Simulator. HRF. Sample MELFI Insertion USND2 – Hardware Activation CARDOX – Preparation Steps and Hardware Setup EMU 3010 Return To Service (RTS) – Part 1 CARDOX – Scan FENIX. Transfer of Bioecologiya Containers to Soyuz 715 EXPOSE-R БСПН (Payload Server) data download to RSS1 Laptop ТК 715 Return Stowage CARDOX – Blood Pressure Operations Crew Quarter Cleaning HRF Blood Collection Hardware Stowage PROBOY. Copy and Downlink Data USND2 – Hardware Deactivation WRS Water Sample Analysis WHC Fill [Deferred] OTKLIK. Hardware Check CALCIUM. Photograph, Process and Downlink Photos LBNP Exercise (FINAL) EMU 3010 Return To Service (RTS), Part 2 WHC Fill [Deferred] Verification of ИП-1 Flow Sensor Position EMU 3010 Return To Service (RTS), Part 3 Water Recovery System (WRS). WPA Waste Water Tank Offload into CWC. Start Crew prep for departure Sanitary-Hygiene Status Monitoring / r/g 9032 ALGOMETRIA. Experiment Ops / r/g 9039 TOCA Data Recording Teardown of Chibis-M components. Private Medical Conference Handhold Experiment Platform (HXP) Photo, Part 3 Crew prep for departure Photography of БСК-1 (А457). Water Recovery System (WRS). Terminate WPA Waste Water Tank Offload into CWC EMU 3010 Return To Service (RTS), Part 4 Microbial Sample Collection Removal of ЛКТ (ТА251МБ) and ROM from ТК 715 БО СОЖ Maintenance IMS Delta File Prep TWIN – Preparation for urine sampling Preventive maintenance of MRM1 АСП-О hatch sealing mechanisms and Soyuz 715 Hatch (MRM1) Perform a bag level audit of the PMM1P3 to determine contents at this location Air sampling using АК-1М sampler in SM, FGB ИПД Air Sampling for Ammonia in SM HRF – Hardware Setup CONTROL. Switching Indicator-ISS P/L measuring modes WRS – Recycle Tank Fill Cognition – Experiment Ops COGN – Experiment Ops and Questionnaire Completed Task List Items None Ground Activities All activities were completed unless otherwise noted. EMU Return To Service ops SSRMS walkoff to N2 Three-Day Look Ahead: Wednesday, 06/10: Crew Quarters starboard cleaning, Twin Studies, Change of Command ceremony, crew departure prep Thursday, 06/11: 41S undock/landing, Sprint Portable Pulmonary Function setup, Twin Studies Friday, 06/12: Sprint VO2 ops, Radiation Dosimetry QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) On [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Process Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

from ISS On-Orbit Status Report http://ift.tt/1GeBzDI
via IFTTT

No comments: