41 Soyuz (41S) Undock/Landing: 41S undocked and landed today at approximately 8:44 CDT, bringing Terry Virts, Anton Shkaplerov and Samantha Cristoforetti back to Earth. The undock began 3-crew operations on the ISS until the arrival of 43S currently planned for late in July. 41S Return Sample Collections Transfer: Kelly collected saliva, buccal, urine, and blood for Twins Study, Biochemical Profile, CardioOx, Salivary Markers, and Microbiome. Cristoforetti collected ambient collections for Microbiome and Salivary Markers. The samples to be frozen were inserted into Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) for return on a future flight. The ambient samples were handed over to be packed in the Soyuz. Additionally, Cristoforetti packed the Stem Cell Differentiation (SCD) samples from MELFI into the SCD Experiment Pouches and transferred them to Shkaplerov for final packing in the Soyuz. Today’s Planned Activities All activities were completed unless otherwise noted. TWIN – Saliva Sample Collection HRF Blood Draw and Stow Prep Morning Inspection TWIN – Saliva Sample Collection HRF – Sample MELFI Insertion HRF Urine Sample Collection TWIN – Urine Sample Collection HRF – Sample MELFI Insertion ТК 715 Return Cargo Ops / r/g 8970 Setup GoPro HERO3 camera in ТК 715 [СА] Closing window shutters 6,8,9,12,13,14 / r/g 6965 Data Prep for Return EHS – IV-TEPC Transfer Stem Cell Differentiation (SCD) – Container Retrieval from MELFI Separation of EDV (KOV) (Separate EDV (KOV) No.1106 to EDV (KOV) No.1104) for Elektron or EDV-SV Stem Cell Differentiation (SCD) – Experiment Container Packing for Return Personal Medication Stowage SALMARK – Questionnaire Completion SCD Transfer WRS – Recycle Tank Fill HRF Closeout Ops TWIN – Blood Collection TWIN – Blood collection operator JRNL – Journal Entry HRF – Blood collection operator HRF Blood Draw Photo of ТК 715 [СА] and items prior to undocking / r/g 8970 TWIN – Gathering and pre-packing blood samples for return SALMARK – Questionnaire Completion Soyuz 715 Loading Complete Report (S-band) / r/g 8970, 8650 RR-HABITAT-STOW Photography of the external surface of Soyuz 715 [СА] БО hatch cover to assess slot antenna r/g 0284 Downlink photo of the outer side of ТК 715 [СА] БО hatch/manhole cover / r/g 0284 Glacier 5 – Desiccant Pack Swap GLACIER5 Battery Changeout HRF Urine Sample Collection Comm Config for ТК 715 Undocking and Descent r/g 8229 HRF – Sample MELFI Insertion Disconnecting TVS Camera КЛ-153 from МRM1 TVS / r/g 7144 Soyuz 715 Activation, Comm Check from Soyuz 715 via S/G2 / Ascent and Descent r/g 9020, 9045,9067 ISS HAM RADIO Power Down Health Maintenance System (HMS) – Food Frequency Questionnaire TWIN – Equipment Stowage Gathering and Connecting КСПЭ Equipment for Hatch Closure coverage from MRM1 with simultaneous recording to CF card in mpeg2 format via Ku-band Closing USOS Window Shutters Soyuz 715 – MRM1 Hatch Closure r/g 9067 TV coverage of ТК 715-MRM1 Hatch Closure ТК 715- MRM1 hatch leak check / Ascent and Descent Downlink of TV coverage Hatch Closure data from MRM1 КСПЭ hardware Deactivation and Closing Applications on ЦП SSC ТК 715 ODF Ops; Undocking and Descent Ops HAP2 – Hardware Stowage Monitoring Soyuz 715 Undocking, photos of ТК docking assembly / r/g 9066 Video of ТК 715 Undocking and Departure from ISS / r/g 9065 SPRINT. System Setup [Deferred] Reconfigure MRM1-Soyuz PEV to CLOSED position ISTOCHNIK-M Preparation For Measurements. / r/g 9068 ISTOCHNIK-M. Activation of ТК 715 TLM Recording Mode. / r/g 9068 ISTOCHNIK-M Closeout Ops / r/g 9068 ТК 715 comm reconfig for nominal ops after landing Completed Task List Items None Ground Activities All activities were completed unless otherwise noted. 41S undock operations Three-Day Look Ahead: Friday, 06/12: Sprint VO2 ops, Radiation Dosimetry Saturday, 06/13: Crew off duty, housekeeping Sunday, 06/14: Crew off duty QUICK ISS Status – Environmental Control Group: Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) On [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Standby Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up
from ISS On-Orbit Status Report http://ift.tt/1HzqOOC
via IFTTT
No comments:
Post a Comment