Latest YouTube Video

Thursday, June 18, 2015

ISS Daily Summary Report – 6/17/2015

Ocular Health: Kelly and Kornienko performed their Flight Day 90 (FD90) Ocular Health exams.  With Padalka assisting in setup and as the Crew Medical Officer (CMO)/Operator, Kelly and Kornienko underwent vision tests, blood pressure readings, tonometry, and each took a vision questionnaire. The Ocular Health protocol calls for a systematic gathering of physiological data to characterize the risk of microgravity-induced visual impairment/intracranial pressure in ISS crewmembers. Researchers believe that the measurement of visual, vascular and central nervous system changes over the course of this experiment and during the subsequent post-flight recovery will assist in the development of countermeasures, clinical monitoring strategies, and clinical practice guidelines. Japanese Experiment Module Airlock (JEMAL) Operations: Kelly repressed the JEMAL and following a leak check, opened the inner hatch and retracted the Slide Table (ST) into the JEM Pressurized Module (JPM).  He then removed the Free Space Passive Dosimeter for Life-Science Experiments in Space (PADLES) from the Multi-Purpose Experiment Platform (MPEP) and packed them for return. Free-Space PADLES is an investigation that uses a Sealed Free-Space Dosimeter to measure radiation doses outside the International Space Station (ISS). The obtained results are used for verification of the ISS hull wall shielding contribution, and a benchmark study to develop existing simulation codes and space radiation models for present, and future, human space flight activities. Rodent Research-2 (RR2) Microgravity Science Glovebox (MSG) Cleanup:  Kelly completed the first of two cleanup sessions following the completion of RR2.  Deployed hardware used during the RR-2 activities was cleaned and stowed in its nominal location and consumables were disposed of.  The MSG will next be used tomorrow, when Padalka installs the Observation Analysis of Smectic Islands in Space (OASIS) experiment. Today’s Planned Activities All activities were completed unless otherwise noted. IDENTIFIKATSIYA. Copy ИМУ-Ц micro-accelerometer data to laptop Replacement of ГА DC Filter Unit (БФ) Install No.062 VIS Vision Test Ocular Health – Vision Test using tonometer (Setup) Ocular Health – Blood Pressure Operations Ocular Health – Tonometry Test VIS Vision Questionnaire JEMAL – Pressurization Checking Laptop “Operation Mode” Display after Replacement of ГА DC Filter Unit (БФ) Ocular Health – Blood Pressure Operations Ocular Health – Tonometry Test – Crew Medical Officer JEMAL – Leak Check after Pressurization VIS Vision Questionnaire XF305 – Camcorder Setup JEM Airlock Slide Table (ST) Extension to JPM Side Test activation of Vozdukh Atmosphere Purification System Emergency Vacuum Valves [АВК СОА] Verification of ИП-1 Flow Sensor Position MPEP – Dosimeter Removal СОЖ Maintenance DATA TRANSMISSION RADIO LINK (РСПИ) БЗУ Software Upgrade OASIS – Overview HXP – Adapter Removal JEM – Slide Table Retraction Ocular Health – Vision Test using tonometer (Stowage) Preparing for Photography of EV1 (DC1) and EV1 (MRM2) Window Glass MSG – Activation of MSG glove box PROBOY. RSЕ1 Laptop Ops. PROBOY. Penetration Simulator Ops. Rodent Research (RR) – MSG Cleanup PROBOY. Copy and Downlink Data Photography of EV1 (DC1) and EV1 (MRM2) Window Glass. Photo Downlink OBSTANOVKA. Equipment setup. Crew Prep for PAO PAO Hardware Setup OBSTANOVKA. Re-mate Telemetry connectors. OBSTANOVKA. Measuring Feeder 29, 30 БСКЭ5-32 power voltage and current consumption PAO Event Vacuum Cleaning СКПФ1, СКПФ2 Dust Filters and MRM1  ГЖТ Rodent Research (RR) – MSG Cleanup OBSTANOVKA. Re-mate Telemetry connectors. OBSTANOVKA. Closeout Ops. Flight Director / ISS Crew Tagup Completed Task List Items None  Ground Activities All activities were completed unless otherwise noted. Ocular Health (Tonometry) ops Meteron commanding Three-Day Look Ahead: Thursday, 06/18: RR Microgravity Science Glovebox LSAH cleanup, Ocular Health, OASIS setup Friday, 06/19: Ocular Health, CUCU/CCP checkout, SPX-7 OBT RoBOT training Saturday, 06/20: Crew off duty, housekeeping QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) On [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Standby Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

from ISS On-Orbit Status Report http://ift.tt/1SreymE
via IFTTT

No comments: