Latest YouTube Video

Friday, October 9, 2015

ISS Daily Summary Report – 10/8/15

NanoRack Cubesat Deployer (NRCSD) #6 Operations:  Overnight, three unsuccessful attempts were made to retract the secondary latch associated with deployer # 6, which would have allowed the deployment of the remaining two cubesats for this operation.  The next troubleshooting attempt to launch the cubesats will involve cycling the latches during a Japanese Experiment Module Remote Manipulator System (JEMRMS) E-stop test to jolt the deployer.  A total of 14 cubesats have been deployed this week:  2 Danish satellites and 12 Planet Lab Doves.  The Danish satellite GOMX-3 has an advanced antenna-pointing system and a variety of communications capabilities. It contains radios to test reception and data downlink for GPS satellites, the military and for weather monitoring, air traffic control and other uses.  The Danish satellite AAUSAT-5 uses a student-designed and constructed Automatic Identification System (AIS) receiver to track ship signals in support of a space-based AIS system. The Dove nanosatellites enable imagery of the entire planet to be taken on a frequent basis, with humanitarian and environmental applications ranging from monitoring deforestation and the ice caps to disaster relief and improving agriculture yields in developing nations   Integrated Resistance and Aerobic Training Study (Sprint) Volume of Oxygen Utilized (VO2) Max:  For his Flight Day 195 Sprint VO2 session, Kelly attached Electrocardiogram (ECG) electrodes to himself, set up and donned Heart Rate Monitor hardware, performed Portable Pulmonary Function System calibrations, and then performed the VO2 protocol.  The Sprint VO2 investigation evaluates the use of high intensity, low volume exercise to minimize loss of muscle, bone, and cardiovascular function in ISS crewmembers while reducing total exercise time during long-duration space missions   Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI) 2 Rack Interface Unit (RIU) Replacement:  This morning, Kelly replaced the failed MELFI 2 RIU.  Following the replacement, ground teams successfully activated MELFI 2.  On September 7th this unit stopped providing Health and Status updates and the temperature started to change, indicating a Brayton motor stop.   Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) Vertigo Setup:  Yui reviewed procedures and participated in a conference with the SPHERES ground team in preparation for SPHERES Vertigo runs tomorrow.  This investigation uses the SPHERES free-flying satellites to demonstrate and test enhanced technologies and techniques related to visual inspection and navigation. This effort incorporates hardware and software that enables multiple SPHERES to construct 3D models of a target object and then perform relative navigation solely by reference to those 3D models.   Sleep Log:  Kelly continues a week-long set of Sleep Log entries by making a daily entry.  The Sleep ISS-12 experiment monitors ambient light exposure and crew member activity and collects subjective evaluations of sleep and alertness.  The investigation examines the effects of space flight and ambient light exposure on sleep during a year-long mission on the ISS.   Multi-Purpose Small Payload Rack 2 (MSPR2) Video Recording Unit 2 (VRU2) Checkout:  Yui provided support for troubleshooting an issue with high rate data link data packets from the MSPR2 VRU2.  He connected two camcorders to the MSPR2 so that the ground can command downlink of images.   Node 1 Nadir Power Connections Part 1:  As part of USOS Reconfiguation, Lindgren and Yui changed out bulkhead feedthrough connectors in the Lab to Node 1 vestibule.  They then mated pre-routed jumper cables to the ISS 2 and 3 power domains.  An additional activity is scheduled tomorrow in order to mate an alternate set of jumper cables to the 1 and 4 power domains.  These cables will provide power to Node 1 Nadir Berthing Port and Galley Rack. Service Module (SM) 8.08 Software Transition:  Today, the Service Module Central Computers (ЦВМ) and Service Module Terminal Computers (TBM) were upgraded from the SM 8.07 software load to the SM 8.08 software load.  The new software will support new Russian Cargo and Soyuz vehicles as well as provide 20 new Pre-Determined Debris Avoidance Maneuver (PDAM) Modes and removes SM software related to Automated Transfer Vehicle (ATV).   Mobile Servicing System (MSS) Operations:  During MSS power-up today, the Special Purpose Dexterous Manipulator (SPDM) Arm-2 Shoulder Yaw joint failed to read the expected position and reported an Invalid Joint Position.  The flight control engineering teams are working to troubleshoot and gather data.   Robotics Refueling Mission (RRM) science operations for today have been postponed while they work the issue.   Today’s Planned Activities All activities were completed unless otherwise noted. NEIROIMMUNITET. Venous blood sample processing NEIROIMMUNITET. CORRECTSIA. Processing venous blood sample using Plasma-03 centrifuge NEIROIMMUNITET. CORRECTSIA. Handover to USOS for MELFI Insertion RUEXP – Blood Sample Insertion into MELFI Airlock Manual Valve Close MSPR2 – Video Checkout Node 1 – Nadir port prep – Big picture Battery Swap SEISMOPROGNOZ. Downlink data from Control and Data Acquisition Module (МКСД) HDD Audio Session with the Participants of XIII Korolev Readings and “Science ABC” Festival Node 1 – Nadir port prep – Hardware Gathering SPRINT – Hardware Power On MRM2 comm config to support the P/L Ops ТКГ 429 (SM Aft) Transfers and IMS Ops Geophysical Experiment (ГФИ-1). Battery Charge for Relaksatsiya Experiment Plug in Plan (PiP) – Airlock – UOP Hardware Power Down Kulonovskiy Kristall Experiment Run ТКГ 429 (SM Aft) Transfers and IMS Ops MELF2 – RIU Transfer Node 1 nadir power path connections – Part 1 MRM2 Comm Reconfig for Nominal Ops CALCIUM. Experiment session 8 MELFI-2 Temperature Data Recorder (TDR) Battery Install/Replace Power down hardware downstream of NOD2 UOP2 per Plug in Plan (PiP) SEISMOPROGNOZ. Download data from Control and Data Acquisition Module (МКСД) HDD (end) and start backup Node 1 – Nadir port prep SPRINT Experiment Ops Soyuz 718 Samsung Tablet Computer Charge – start ТКГ 429 (SM Aft) Transfers and IMS Ops EXPRESS Rack Hard Drive Replacement EXPRESS RACK Laptop SW Load Monthly Inspection of T2 Treadmill System Battery Swap KULONOVSKIY KRISTALL. Copying data to removable hard drive On MCC GO Vozdukh Deactivation Airlock Manual Valve Open Plug in Plan (PiP) – Node 2 – Hardware Power-up downstream UOP2 SPRINT – Equipment Stowage Soyuz 718 Samsung tablet charging ALGOMETRIA. […]

from ISS On-Orbit Status Report http://ift.tt/1jgBrws
via IFTTT

No comments: