Latest YouTube Video

Friday, November 13, 2015

ISS Daily Summary Report – 11/12/15

Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) Slosh: After experiencing issues with SPHERES batteries and a hard drive, the SPHERES Slosh Run today was postponed to a later date.  Ground experts are investigating the source of the problems.   Sleep Log:  Kelly recorded a Sleep Log entry today.  The Sleep ISS-12 experiment monitors ambient light exposure and crew member activity and collects subjective evaluations of sleep and alertness.  The investigation examines the effects of space flight and ambient light exposure on sleep during a year-long mission on the ISS.   Nitrogen/Oxygen Recharge System (NORS) Airlock Interface Kit (AIK) Installation:   Kelly continued with NORS AIK installation by rotating the Airlock Cabin Air Rack downward and installing nitrogen and oxygen hoses.  He then installed the NORS manifold and connecting the power, nitrogen, and oxygen lines to it.  Towards the end of the day, Yui worked with ground teams in order to initiate a leak check of the system, which will continue through Friday afternoon.  NORS provides the capability to refill the US Airlock High Pressure Gas Tanks (HPGTs) with nitrogen and oxygen following Shuttle retirement.  Two Recharge Tank Assemblies (Oxygen and Nitrogen) are manifested onboard the Orbital ATK (OA)-4 Flight scheduled to launch on December 3rd.   Today’s Planned Activities All activities were completed unless otherwise noted. Calf Volume Measurement HRF Urine Sample Collection Reminder – ARED Photo/TV HRF – Sample MELFI Insertion O2/N2 Manual Valve Closure for NORS Installation On MCC GO Regeneration of Micropurification Unit (БМП) Ф2 Cartridge (start) SSIPC Management / ISS Crew Tagup SPHERES – Camera Setup and Video Recording Comm Subsystem [СТТС] routine maintenance (LF path, Comm Panels, and VHF receiver test) Headset Audit NORS N2, O2 Hose Installation SPHERES – Battery Stowage Study of veins in lower extremities Repairs of SM Interior Panel 314 by Installing Overlay Panels – Day 2 SPHERES – Camera Setup and Test Ops Video Footage of Greetings Soyuz 717 Samsung Tablet Charge – start Photography of Contamination on ТПК 717 [СА] external window glass across plane 4 SPHERES – Test Shutdown Cell Biology Experiment Facility (CBEF) – Mouse Habitat Unit (MHU) Interface Unit Installation, Part 1 Photos of CQ panels and windows across plane IV On-orbit hearing assessment using EARQ Soyuz 717 Samsung tablet charging – end CBEF – Mouse Habitat Unit (MHU) Interface Unit Installation, Part 2 Nitrogen/Oxygen Recharge System (NORS) Install Support Beams and Manifold CBEF – Mouse Habitat Unit (MHU) Interface Unit Installation, Part 3 TV Conference with “Good Morning” TV show (S+ Ku-band) SPHERES – Data Downlink Progress 428 (DC1) Stowage Ops with IMS Support VIZIR. Experiment Ops. Tagup with specialists as necessary CWQMK Water Sample Analysis СОЖ Maintenance SM TV analog signal reception test HAM radio session from Columbus HMS – Food Frequency Questionnaire IMS Delta File Prep Photo/TV Camcorder Setup Verification for ARED Exercise Nitrogen Oxygen Recharge System (NORS) Leak Check Initialization JRNL – Journal Entry [Deferred] EHS MCD – In-flight Microbiology Water analysis and data recording VHF2d test from SM (using primary [СТТС] sets) Crew Discretionary Conference On MCC GO Regeneration of БМП Ф2 Absorption Cartridge (end) SPRINT Reminder Preparation of Reports for Roscosmos Web Site and Social Media ECON-M. Observation and Photography URAGAN Observations and Photography   Completed Task List Items None   Ground Activities All activities were completed unless otherwise noted. NORS Leak Checks   Three-Day Look Ahead: Friday, 11/13:  IMAX File D/L, Capillary Beverage, NORS Leak Check completion Saturday, 11/14:  Crew off Duty, Weekly Cleaning Sunday, 11/15: Crew off Duty   QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Shutdown Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

from ISS On-Orbit Status Report http://ift.tt/1MrYOLn
via IFTTT

No comments: