Latest YouTube Video

Friday, January 29, 2016

ISS Daily Summary Report – 01/28/16

Story Time from Space:  Peake read “Science on the Space Station” from the book Max Goes to the Space Station,” discussed the subject on camera and demonstrated the scientific principles involved.  Kelly obtained pictures of Peake while he was reading the book with the Cupola in the background.  The video recording will be downlinked to the ground and used for educational purposes.   Sleep Actiwatch Downlink and Configuration:  Kelly downloaded data from his and Kornienko’s Actiwatch Spectrums and then configured the devices to continue collecting data.  The actiwatches have a photodiode that measures ambient light and an accelerometer to measure the movement of the arm or leg that the watch is attached to.  The actiwatch data recorded on the watch supports the Sleep ISS-12 experiment, which assesses the effects of space flight and ambient light exposure on sleep during a year-long mission on the ISS.   Low Earth Orbiting Navigation Experiment for Spacecraft Testing Autonomous Rendezvous and Docking (LONESTAR):  Peake depressurized and vented the JEM Airlock today in preparation for the deploy of the LONESTAR tomorrow.  LONESTAR contains satellites AggieSat4 (built by Texas A&M University students) and Bevo-2 (built by University of Texas students).  After deploy away from the ISS, AggieSat4 ejects the BEVO-2 satellite.  Both satellites then perform cross-linking communications, exchange data, link to GPS, and transmit to ground radio stations.  LONESTAR is used to further develop and refines autonomous navigation, rendezvous and docking software and procedures.  Future NASA missions to destinations such as asteroids and other celestial bodies require the use of autonomous navigation systems.   Orbital ATK (OA)-4 Cargo Operations:  All three USOS Crew continued transferring Cygnus cargo to ISS today. As of yesterday afternoon, approximately 17 hours remain to be completed.  Cygnus is scheduled to unberth from ISS on February 19th.   Japanese Experiment Module (JEM) Internal Port Camera:  Peake worked to relocate the JEM internal port camera slightly lower from its current position over the JEM Airlock. The new position will avoid interference with upcoming Stowage Frame installation.   Power Strip (PS)-120 Junction Box Installation:  Peak has installed a PS-120 Junction Box within the JEM today. Once installed, he changed the power source for the Freezer-Refrigerator Of STirling cycle (FROST) from Utility Outlet Panel (UOP) to the newly installed junction box.   Sound Level Measurements and Acoustic Blanket:  Kopra configured and checked out a new Sound Level Meter, then obtained sound level measurements in Node 3.  There was not sufficient time to complete the Acoustic Blanket installation today, therefore the activity will be deferred to an alternate day.  The two Acoustic Blankets that were to be installed today were intended to reduce the noise coming from Treadmill 2 (T2), especially near the runner’s head.     Today’s Planned Activities All activities were completed unless otherwise noted. JEM System Laptop Terminal Reboot WRS Water Sample Analysis JEMAL – Depress and Vent WRM. Condensate Pumping Initiation RGN – recycle tank drain into EDV EVA Medical Kit Configuration Brine and urine transfer from EDV-U to Progress 429 (SM Aft) Rodnik H2O Tank and Flushing Connector JPM – Internal camera relocation Photo/TV Battery Charge Initiation Scheduled Maintenance of Compound Specific Analyzer- Combustion Products (CSA-CP) Checkout of BETA-08 Data Output Device (УСИ) using Gamma-1M Equipment WRM.  Terminate Condensate Pumping Health Maintenance System (HMS) – Food Frequency Questionnaire Telemetry checkout of Orlan systems, Orlan interface unit (БСС), comm, and biomed parameters JEM – Installation of PS-120 Junction Box Comm reconfig into initial after Orlan Comm. Check Specific EVA Procedures Study Cygnus Cargo Operations DC1 EV hatch1 pusher checkout JEMAL – Verifying depressurization complete ESA Weekly Crew Conference JEM Airlock Depressurization and Vent Confirmation Story Time (ST) – Photography Photo/Video Equipment Battery Changeout TOCA Data Recording ALGOMETRIA. Search and stowage of TTA-Data No.05 data storage device Cygnus Cargo Operations IMS and Stowage Conference Checkout of Sound Level Meter SLEEP – Configuration and data download Sound level measurements СОЖ Maintenance IMS Delta File Prep Preventive Maintenance of FS1 Laptop (Cleaning and rebooting) BRI Monthly Maintenance Cygnus Cargo Operations SLM Acoustic Blanket Install [Deferred] Preventive Maintenance of SM АСП-О Hatch Sealing Mechanism and Progress 429 [АСА] Hatch door (SM Aft) before RS EVA Progress 429 (SM Aft) Activation, Air Duct Removal Removal of ССВП Screw Clamps from SM Aft and MPEG2 Video Recording of SM Aft – Progress 429 interface.Video downlink via OCA ALGOMETRIA. Experiment Ops SM Aft – Progress 429 Hatch Closure ПрК-СУ and СУ – ТГК 429 (SM Aft) Hatch Leak Check SLM Data Transfer Warning/Emergency Book Deployment Health Maintenance System (HMS) – Food Frequency Questionnaire INTERACTION-2. Experiment Ops Cygnus – Cargo Operations Tagup Terminate Photo/Video Battery Charge JRNL – Journal Entry COGNITION – Experiment Ops and Filling Questionnaire   Completed Task List Items None   Ground Activities All activities were completed unless otherwise noted. Nominal System Commanding   Three-Day Look Ahead: Friday, 01/29: Cygnus Cargo Transfer, BASS-M Ops, Lonestar Deploy, Kelly Day Off Saturday, 01/30: Crew Day Off, Weekly Cleaning Sunday, 01/31:  Crew Day Off   QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Operate Carbon Dioxide Removal Assembly (CDRA) Node 3 Override Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Full Up Trace Contaminant Control System (TCCS) Node 3 Off  

from ISS On-Orbit Status Report http://ift.tt/1QKk3xV
via IFTTT

No comments: