ISS Daily Summary Report – 1/12/16

Electrostatic Levitation Furnaces 1 and 2  (ELF 1 & 2) Setup:  Kelly and Peake  set up the Japan Aerospace Exploration Agency (JAXA) ELF equipment for installation in the Multi-purpose Small Payload Rack 2 (MSPR2) work volume in the Japanese Experiment Module (JEM).   The crew was unable to complete all of the installation activities today.  They will be completed at the earliest opportunity.  The ELF is an experimental facility designed to levitate, melt and solidify materials employing containerless processing techniques that use the electrostatic levitation method with charged samples and electrodes. With this facility, thermophysical properties of high temperature melts can be measured and solidification from deeply undercooled melts can be achieved.   Fluid Shifts Before, During and After Prolonged Space Flight and Their Association with Intracranial Pressure and Visual Impairment (Fluid Shifts):   Kelly and Kornienko continued their Return minus 45 day (R-45) Fluid Shifts activities today in the Russian Segment with assistance from Volkov.   This third part of the Fluid Shifts experiment utilizes the Russian Chibis (Lower Body Negative Pressure – LBNP) suit during ultrasound measurements.  Fluid Shifts investigates the causes for severe and lasting physical changes to astronaut’s eyes. Because the headward fluid shift is a hypothesized contributor to these changes, reversing this fluid shift with a lower body negative pressure device is investigated as a possible intervention. Results from this study may help to develop preventative measures against lasting changes in vision and eye damage.   Japanese Experiment Module (JEM) Airlock Pressurization and Leak Check:  In preparation for removal of the Robotics Refueling Mission (RRM) Task Board 4 and the Robotic Micro Conical Tool (RMCT)-1 from the JEM Airlock Slide Table later this month, Kelly has pressurized the JEM Airlock and performed a leak check today.   Extravehicular Activity (EVA) Tool Preparation:  Kopra and Peake continued to prepare for Friday’s Sequential Shunt Unit (SSU) EVA.  Today, they re-familiarized themselves with the tools needed to perform the SSU change out, installed a long term tether onto the EPIC MDM Ethernet Cable bundle to allow for external stowage without being plugged in, if required.  In addition, they packed the Internal Docking Adapter (IDA) EVA bag with the required cabling.   Intermodule Ventilation (IMV) Flow Measurements:  As part of system health monitoring, Kopra utilized a Velocicalc tool in order to obtain measurements of selected ventilation inlets and outlets within the USOS.  Today’s measurements took place within the Joint Airlock, Node1, Node 2, Node 3, Cupola, and the Lab.   Mobile Servicing System (MSS) Operations:   This afternoon, ground controllers are performing a periodic survey of the Scan Testbed Experiment on ExPRESS Logistics Carrier (ELC)-3.  Once the survey is complete, they will command an Mobile Transporter (MT) translation from Worksite (WS)-7 to WS-2. The move is required in order to provide camera support during Friday’s Sequential Shunt Unit (SSU) 1B Extravehicular Activity (EVA) and to preposition the Space Station Remote Manipulator System (SSRMS) for next week’s Main Bus Switching Unit (MBSU) demonstation activity.   Today’s Planned Activities All activities were completed unless otherwise noted. Morning Inspection. SM ПСС (Caution & Warning Panel) Test Laptop RS1(2) Reboot RSS 1, 2 Reboot Hematocrit Test MO – Experiment Ops Hematocrit  Hardware Stowage JEM Airlock Pressurization On MCC GO Regeneration of БМП Ф1 Micropurification Cartridge БСПН Log-File Dump RGN – Initiate drain into EDV FLUID SHIFTS ISS Crew Handover JEM Airlock Leak Check Fine Motor Skills – Examination RGN – Terminate water drain into EDV MELFI 3 TDR – Battery Swap Collect SM and FGB Air Samples Using АК-1М Sampler WRS – Recycle Tank Fill ELF S/U- Procedure Review SM Air Sampling for FREON Using АК-1М Sampler XF305 Camcorder Settings Adjustment VEG-01 – Plant Photo MSPR2 – Software Setup СОЖ Maintenance MSPR2 – Configuration Setup MSPR2 – Software Setup KULONOVSKIY KRISTALL. Experiment Ops EVA Tool Config ALGOMETRIA. Experiment Ops IMS Delta File Prep SM Ventilation System Preventive Maintenance. Group В1 Evening Work Prep EXPOSE-R. Copy and Downlink Data WRS – Recycle Tank Fill INTERACTION-2. Experiment Ops IMV Flow Measurement USND2 – Hardware installation and activation URYSIS Setup for Operation On MCC GO БМП Ф1 Absorption Cartridge Regeneration Preparation of Reports for Roscosmos Web Site and Social Media Video Recording for All-Russia State Television and Radio Broadcasting Company (ВГТРК) ECON-M. Observation and Photography   Completed Task List Items None   Ground Activities All activities were completed unless otherwise noted. Scan Test Bed Survey with MSS MT translation from WS-7 to WS-2   Three-Day Look Ahead: Wednesday, 01/13: Fluid Shifts, Sprint Ultrsound, Circadian Rhythms, Medical Emergency Training, Cygnus Cargo Ops Thursday, 01/14: EVA Procedure Review, EVA Tool Audit, Equipment Lock Preparation Friday, 01/15: SSU 1B EVA   QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Full Up Trace Contaminant Control System (TCCS) Node 3 Off  

from ISS On-Orbit Status Report http://ift.tt/1PWRVWb
via IFTTT

No comments: