Latest YouTube Video

Monday, January 18, 2016

ISS Daily Summary Report – 1/15/16

Extravehicular Activity (EVA) #35:  Extravehicular Activity (EVA) #35:  Peake and Kopra egressed the Airlock at 7am CST in order to perform EVA #35.  During the EVA, Kopra’s carbon dioxide (CO2) sensor failed and then later he noticed a water bubble in his helmet.  Based on the trend, the Flight Control Team decided to terminate the EVA.  The Phased Elapsed Time (PET) for today’s EVA was 04:43 hours with Crew Lock ingress taking place at 11:40 pm CST.  The objectives for the EVA are as follows: Sequential Shunt Unit (SSU) 1B:  The new SSU was successfully checked out. Ground teams are in the process of configuring the 1B channel for normal operations. ·         Remove and Replace Sequential Shunt Unit (SSU) 1B – Completed ·         Install Node 3 Non-Propulsive Vent (NPV) – Completed ·         Retrieve Camera Port 9 Light - Deferred ·         Route International Docking Adapter 3 Cables - Partially Completed ·         Mate Enhanced Processor and Integrated Communications (EPIC) MDM Ethernet Cable - Deferred Today’s Planned Activities All activities were completed unless otherwise noted. Checking fuse LED indication on БПП-4, БПП-7 Fuse Boxes in MRM1 Closing USOS Window Shutters ISS HAM RADIO Power Down ISS Crew and ГОГУ (RSA Flight Control Team) Weekly Conference Photo/TV EVA Camera Test EVA CUCU Deactivation EMU Preparation for US EVA USOS EVA Comm Config Life On The Station Photo and Video OTKLIK. Hardware monitoring and sensitivity threshold adjustment Vacuum Cleaning of ВД1 and ВД2 air ducts in DC1 EMU Prep for EVA Prebreathe in EMU BAR. АУ-1 Ultrasound Analyzer Repair and Recovery EMU Prebreathe – Assistance СОЖ Maintenance Charging ТК 718 IRIDIUM Phone – Configuration setup, start charge Test activation of Vozdukh Atmosphere Purification System Emergency Vacuum Valves Crew Lock Depress Maintenance activation of Atmosphere Purification System Emergency Vacuum Valves [АВК СОА] from the Sparest Kit (СМ1РО_3_321_1, Bag II-1/256-1, [АВК] Cover (007223R) Charging ТК 718 IRIDIUM Phone – Battery Charge Status Charging ТК 718 IRIDIUM Phone – Terminate Charging Maintenance activation of Atmosphere Purification System  Emergency Vacuum Valves [АВК СОА] from the Spares Kit(СМ1РО_3_321_1, Bag II-1/256-1, [АВК] Cover (007223R) Crew Lock Egress US EVA – Preparation for SSU R&R Pre-packing Russian Cargo Items for Disposal via Cygnus AO-4 Pumping brine and urine from EDV-U to Progress 429 (SM Aft) Rodnik H2O Tank and Flushing connector ТК 719 IRIDIUM Phone Charging – Initiate Charge Charging ТК 719 IRIDIUM Phone – Battery Charge Status Recharging ТK 719 IRIDIUM Phone – Terminate Charge, Teardown the Setup, Closeout Ops (ФГБ1ПГО_2_224_1, CTB 1017 (002857J), Soft Container (00044322R) US EVA – SSU R&R Changeout of Dust Filter ПФ1-4 Cartridges in SM (ТГК431ГрО_зона1_Контейнер5.  Discard the removed items. Reflect changes in IMS) US EVA – Cleanup after SSU R&R MOTOCARD. Experiment Ops US EVA – NPV Installation US EVA – IDA 3 Cable Routing [Partially Complete] MOTOCARD. Operator Assistance with the Experiment Video Footage of Greetings ISS Crew Handover US EVA – PMA3 Bolt Release [Deferred] US EVA CP9 Activities [Deferred] US EVA – EPIC MDM Cable_W0087 Connection [Deferred] URYSIS Setup for Operation Crew Lock ingress Closing USOS Window Shutters EVA Glove Photo Setup Return to nominal comm configuration after US EVA US Post-EVA Cleanup PBA relocation Earth photo/video ops IMS Delta File Prep   Completed Task List Items None   Ground Activities All activities were completed unless otherwise noted. System commanding associated with EVA   Three-Day Look Ahead: Saturday, 01/16:  USOS Airlock Deconfiguration, EVA Tool Stow, EVA debrief with ground Sunday, 01/17: Crew Day Off Monday, 01/18:  SPHERES, MBSU Demo Day 1   QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Standby Trace Contaminant Control System (TCCS) Lab Full Up Trace Contaminant Control System (TCCS) Node 3 Off  

from ISS On-Orbit Status Report http://ift.tt/1lnAIdA
via IFTTT

No comments: