Latest YouTube Video

Tuesday, May 10, 2016

ISS Daily Summary Report – 05/09/16

Sprint: The crew completed the exercise protocol and data collection for Sprint VO2.  Sprint VO2 measures oxygen uptake, ventilatory threshold, and other physiological parameters. It evaluates the use of high intensity, low volume exercise training to minimize loss of muscle, bone, and cardiovascular function in ISS crew members during long-duration missions.   Meteor Procedure Review: In preparation for upcoming activities later this week, the crew reviewed procedures for the software load and Meteor installation. Meteor will perform the first space-based observations of the chemical composition of meteors entering Earth’s atmosphere. Meteors are relatively rare and are difficult to monitor from the ground because of the interference created by Earth’s atmosphere. The Meteor investigation takes high-resolution video and images of the atmosphere and uses a software program to search for bright spots which can later be analyzed on the ground.   NanoRack Module 9: The crew completed the fifth NanoRack Module 9 experiment session by activating, deactivating, and shaking the mixture tubes to facilitate the experiment. Module-9 is a collection of student research projects utilizing the NanoRacks Mixsticks. Student teams from across the United States design their own experiments using flight approved fluids and materials.   Rodent Research 3 CASIS: Crewmembers inspected and restocked the habitats with water, and with Food Bars retrieved from the Minus Eighty Degree Laboratory Freezer for ISS (MELFI).   SpaceX (SpX)-8 Departure Preparation: In preparation for SpX-8 unberth next Wednesday, May 11, the following were completed today: Robotics On-Board Trainer (RoBOT) session to practice vehicle release including two release runs and self study. Commercial Off The Shelf (COTS) Ultra High Frequency (UHF) Communication Unit (CUCU) and Dragon Crew Command Panel (CCP) activation and checkout. POLAR transfer to Dragon. Double Cold Bag packing. At this time, the weather looks favorable for splashdown Wednesday.   Pressurized Mating Adapter (PMA1)/Node 1 (N1) Intermodule Ventilation (IMV) Reconfiguration: Russian Segment and USOS split ventilation is still in effect. Over the weekend, the Lab Forward Starboard IMV fan was activated to address a ppCO2 delta between the Lab and N2. Today, the N3 Overhead Starboard IMV fan was deactivated to reduce the amount of air that is being pulled into the N1 overhead diffuser from PMA1.  Airflow from N1 into N3 will be exchanged through the hatch only. The USOS ppCO2 24-hour average is 3.18 mmHg. Teams will continue monitoring CO2 at multiple locations throughout ISS.   Today’s Planned Activities All activities were completed unless otherwise noted. NANO-MOD9 – Session 5 SPRINT Experiment Ops (Subject) Gather Dragon Vestibule Outfitting Kit (VOK) EML Changing the measurement mode of the High Speed Camera to STD mode ISS HAM Video Ops PLR Big Words and Procedure Review for Transfer of Polar to Dragon Module-28 retrieval from MELFI and stowage NANO – Module-33 removal from JPM1F5 Fluid Shifts – Stow remaining hardware from CTB into initial location and bags stowage SPRINT Equipment Stowage PLR Big Words and Procedure Review for Transfer of Polar to Dragon POLAR – Polar removal from Express Rack and Transfer to  Dragon POLAR – Polar removal from Express Rack and Transfer to Dragon POLAR – Polar removal from Express Rack and Transfer to Dragon WRK – Water Fill Procedure Review METEOR – Familiarization with Experiment Plan Rodent Research (RR) Camcorder Setup RR – Retrieve habitat food bars from MELFI RR – Habitat Restock Dragon Departure Procedure Review СОЖ Maintenance Crew OBT, ROBoT onboard simulator, Release CUCU Check SPACE PUP – Data recorder transfer and packing SPACE PUP – Samples retrieval from MELFI SPACE PUP – Container with samples packing in protective film WRK – Water Refill Laptop transfer DCB – Unpacking procedure review DCB – DCB bags packing SPRINT – Closeout Ops   Completed Task List Items None   Ground Activities All activities were completed unless otherwise noted. Dragon RoBOT OBT CUCU activation RR habitat restock Nominal ground commanding   Three-Day Look Ahead: Tuesday, 05/10: Double Cold Bag pack, N2 CPA cable R&R, Dragon egress Wednesday, 05/11: SpX-8 unberth/splashdown, METEOR s/w image load, Sprint, Spheroids data copy Thursday, 05/12: JSSOD M removal/Cubesat deployer insert, Rodent Research, Neuro Mapping   QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Norm Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up    

from ISS On-Orbit Status Report http://ift.tt/1YjrWeN
via IFTTT

No comments: