Latest YouTube Video

Wednesday, June 22, 2016

ISS Daily Summary Report – 06/21/16

NanoRacks CubeSat Deployer- External (NRCSD-E) Operations: Following Cygnus unberth last week, today NRCSD-E conducted post departure satellite deployments prior to Cygnus re-entry tomorrow, June 22. This set of cubesats includes 3 deployment silos containing a total of 5 LEMUR satellites.  Two out of three silos (four out of five satellites) were successfully deployed. The Orbital team downlinked and reviewed imagery to ascertain why one of the CubeSats did not deploy. Further troubleshooting is ongoing. The LEMUR satellites are equipped with payloads to provide two primary data products: AIS Data (Maritime Domain Awareness) and GPS-RO Data (Weather). NRCSD-E is a mechanical separation system for small U-class satellites designed specifically to interface with the Orbital-ATK Cygnus cargo resupply vehicle. It consists of an array of up to six individual 6U deployers contained within one mechanical housing that releases the CubeSats from Cygnus after it has completed its primary mission and departed the ISS. Multi-Omics Operations:  The crew supported the Japan Aerospace Exploration Agency (JAXA) Multi-Omics investigation by collecting saliva samples and inserting them into the Minus Eighty-degree Freezer for ISS (MELFI). The investigation evaluates the impacts of space environment and prebiotics on astronauts’ immune function by combining the data obtained from the measurements of changes in the microbiological composition, metabolites profiles, and the immune system. Extravehicular Mobility Unit (EMU) Swap: In preparation for tomorrow’s loop scrub activities, the crew retrieved EMUs 3005 and 3008 from the Crewlock and temp stowed them. He then removed EMU 3010 from the forward EMU Don/Doff Assembly (EDDA) and installed EMU 3008. He removed EMU 3003 from the aft EDDA and installed EMU 3005. Microbial In-Flight Water Operations: The crew performed analysis of water samples collected earlier to determine water quality onboard the ISS. The focus was on microbial and coliform detection.  On-Board Training (OBT) 46 Soyuz (46S) Emergency Drill: The crew completed an emergency egress drill for proficiency in the event of an ISS emergency requiring crew departure. The OBT is scheduled after 12-14 weeks aboard the ISS and once every two and one half months thereafter.  Today’s Planned Activities All activities were completed unless otherwise noted. Multi Omics (MO) Saliva Sample Collection Biochemical Urine Test r/g 2583 Multi Omics (MO) MELFI Sample Insertion Multi Omics (MO) Equipment Stowage Biochemical Urine Test r/g 2583 Multi Omics (MO) Questionnaire Completion URISYS Hardware Stowage JEMRMS Activate and Start Bus Monitor JEMRMS RLT2 Laptop Activation JEMAL Slide Table (ST) Extension to JEF Side COSMOCARD. Closeout Ops / r/g 2579 Maintenance Closures of Vozdukh Valves Work Prep Verification of ИП-1 Flow Sensor Position URAGAN. Observation and photography using Photo Equipment / r/g 2598 WRS Recycle Tank Fill from EDV RELAKSATSIYAHardware Setup r/g 2599 EMU backpack replacement СОЖ Maintenance COSMOCARD. Preparing for and Starting 24-hr ECG Recording / r/g 2600 RELAKSATSIYA. Parameter Settings Adjustment r/g 2599 JEMAL Slide Table Retraction JEMRMS USB Memory Stick Virus Check RS Photo Cameras Sync Up to Station Time / r/g 1594 JEMRMS  Deactivation of RLT2 Laptop RELAKSATSIYA. Observation r/g 2599 Countermeasures System (CMS) Sprint Exercise, Optional RELAKSATSIYA. Closeout Ops and Hardware Removal r/g 2599 URAGAN. Observation and photography using Photo Equipment / r/g 2598 Stopping JEMRMS Arm Bus Monitoring JEMRMS Data Transfer ISS Emergency Descent OBT r/g 2596 PAO Hardware Setup Crew Prep for PAO PAO Event SPLANH. Preparation for Experiment / r/g 2597 IMS Delta File Prep Habitability Walk-Through Video Reminder SPLANH. Diet Restrictions Reminder / r/g 2595  Completed Task List Items iPAD cert update [Active] Ground Activities All activities were completed unless otherwise noted. EMU ops support Nominal ground commanding Three-Day Look Ahead: Wednesday, 06/22: EMU 3005, 3008 water maintenance/loop scrub Thursday, 06/23: Habitability, Microchannel Diffusion plate changeout Friday, 06/24: JEMAL pressurization, leak check, PBRE hardware stow QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) On Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Standby Urine Processing Assembly (UPA) Norm Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

from ISS On-Orbit Status Report http://ift.tt/28NDxmU
via IFTTT

No comments: