Latest YouTube Video

Wednesday, September 14, 2016

ISS Daily Summary Report – 09/13/2016

NanoRack Cubesat Deployer (NRCSD) #9 Install: After extending the JEM Airlock (JEMAL) slide table into the cabin, FE-5 installed the NRCSD #9 quad-deployer onto the Multi-Purpose Experiment Platform Small Fine Arm Attachment Mechanism (MPEP/SAM) attachments this morning. The crew then retracted the slide table, closed the JEMAL hatch and depressurized the JEMAL in advance of the deployments tomorrow.  NRCSD #9 contains eight Planet Lab Dovesats that will be deployed in pairs of two.  Biomolecule Sequencer (BMS): FE-6 removed and thawed samples and flow cells from the Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI).  The crew then initiated a 48-hour sequencing run.  This sequencing session will be the fourth utilizing the Commercial-Off-the-Shelf (COTS) MinION sequencer and Surface Pro 3 tablet.  The goals of the BMS experiment are to provide a proof-of-concept for the functionality and evaluate crew operability of a DNA sequencer in a space/microgravity environment.  The capability for sequencing of DNA in space could provide for a better ability to identify microbes in real-time, instead of requiring sample return and ground based analysis.  Selectable Optical Diagnostics Instrument Experiment Diffusion Coefficient Mixture-3 (SODI) DCMix-3 Installation:  FE-6 successfully installed the European Space Agency’s (ESA’s) SODI-DCMix-3 experiment into the Microgravity Science Glovebox (MSG).  Once installed, ground controllers will operate the SODI experiment for several weeks.  The main purpose of the SODI DCMix-3 investigation is the measurement of diffusion coefficients of selected ternary mixtures taking advantage of the reduced gravity environment available on board the ISS.  A combination of different and complementary techniques are used to characterize flight candidate samples among water-based and hydrocarbon mixtures. Experimental results from space experiments, performed in the Selectable Optical Diagnostic Instrument, are used to test thermodiffusion theories and develop physical and mathematical models for the estimation of thermo-diffusion coefficients.  Manufacturing Device: FE-6 installed a new medium for the Manufacturing Device.  This print medium will be used for a calibration printing followed by a higher priority device contracted through Center for the Advancement of Science in Space (CASIS).  Manufacturing Device consists of the Additive Manufacturing Facility (AMF), a permanent manufacturing facility on the ISS, providing hardware manufacturing services. The ability to manufacture on the ISS enables on-demand repair and production capability, as well as essential research for manufacturing on long-term missions. AMF allows for immediate repair of essential components, upgrades of existing hardware, installation of new hardware that is manufactured, and the manufacturing capability to support commercial interests on the ISS. Waste and Hygiene Compartment (WHC) Dose Pump Remove and Replace (R&R):  The crew has reported multiple WHC Pre-Treat Bad Quality Light (PTBQL) indications over the past several days.  This is an indication that the Dose Pump is reaching the end of its nominal six month life.  Today, they changed out the Dose Pump to return to nominal WHC operations.  The pump was last replaced in March of 2016. Lab Major Constituent Analyzer (MCA) Return to Operations:  During installation of the MCA vacuum jumper in preparation for Lab MCA pumpdown, the crew was unable to mate the jumper to the Waste Gas Quick Disconnect (QD) due to access issues. Ground teams are working alternate options for connecting the MCA to vacuum.  This is required to return the Lab MCA to an operational state.  Japanese Experiment Module (JEM) Encoder Remove and Replace (R&R):  The JEM Encoder was misconfigured with an off-nominal IP configuration, and could not be accessed. Today, FE-5 replaced the JEM Encoder with an on orbit spare in order to regain functionality.  Today’s Planned Activities All activities were completed unless otherwise noted. Changeout of 240ГК.52Ю 5100-0 Replaceable Unit Panel (ПАС) in DC1 JEMAL Experiment Ops BMS Retrieval of samples from MELFI CUBESAT Hardware Setup BMS Retrieval of samples from MELFI2 SODI Experiment BMS Experiment Ops JEMAL Closeout Ops JEMAL Depress and Vent Waste Hygiene Compartment (WHC) Dose Pump Removal and Replacement Water Recovery System Waste Water Tank Drain WRS Recycle Tank Fill from EDV Test activation of Vozdukh Atmosphere Purification System Emergency Vacuum Valves JEM Airlock Vent СОЖ Maintenance WRS Recycle Tank Fill from EDV HABIT Filling Questionnaire Selectable Optics Diagnostic Instrument (SODI) Hardware Setup IMS Delta File Completed Task List Items JAXA Video Take – Part 5 Ground Activities All activities were completed unless otherwise noted. JEM Airlock Depress Battery 4B1 Reconditioning Lab MCA Pumpout (Aborted) Three-Day Look Ahead: Wednesday, 09/14: NORS O2 transfer, PCHx install, Asian Try Zero-G, ELF troubleshooting Thursday, 09/15: ARED 6 month, JPM window inspection, MDCA H/W replace, ELF troubleshooting Friday, 09/16: T2 Yearly Maintenance, Plant RNA Regulation QUICK ISS Status – Environmental Control Group:                               Component Status Elektron On Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Normal Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

from ISS On-Orbit Status Report http://ift.tt/2cqRxTC
via IFTTT

No comments: