Latest YouTube Video

Monday, September 19, 2016

ISS Daily Summary Report – 09/16/2016

Plant Ribonucleic Acid (RNA) Regulation Harvest: FE-6 removed the European Modular Cultivation System (EMCS) Seed Cassettes from EMCS Rotors A and B stowed them in an EMCS Cold Stowage Pouch.  The removed cassettes were then stowed in MELFI.  New Experiment Container (EC) Seed Cassettes were installed into the EMCS and will be grown for approximately one week.  Compared to plants grown on the ground, plants grown in space experience broad changes in gene expression, which affects how they grow and develop.  The Plant RNA Regulation investigation studies the first steps of gene expression involved in development of roots and shoots. Scientists expect to find new molecules that play a role in how plants adapt and respond to the microgravity environment of space, which provides new insight into growing plants for food and oxygen supplies on long-duration missions. NanoRack Cubesat Deployer (NRCSD) Multi-Purpose Experiment Platform (MPEP) Return:  FE-5 extended the JEM Airlock (JEMAL) Slide Table so that ground controllers could install the MPEP following the successful release of the eight Planet Lab DoveSats.  The crew then retracted the table back into the JEMAL.  The JEMAL will be repressurized next Tuesday, and the NRCSD will be removed next Friday.  Treadmill 2 (T2) Yearly and 6-Monthly Maintenance:  The crew performed a thorough inspection of T2’s drive shaft, pulley teeth, motor, motor carriage bolts, motor belt, mounting screws, lateral belts, and clean the bearing housing.  All observations were photo documented and downlinked to the ground for analysis.  Once the maintenance is completed, T2 was powered up and a checkout was performed.  T2 was cleared for crew use. Health Maintenance System (HMS) Crew Medical Officer (CMO) Training: FE-5 completed a refresher course on some of the equipment and procedures taught in the CMO classes covering crew illness and/or injury. Lessons include text, pictures and video detailing previously learned medical procedures and hardware.  Japanese Experiment Module (JEM) High Definition (HD) Encoder Connectivity – On September 13, the previous AVN 443 HD Encoder in the JEM Module (S/N 1006) was inadvertently misconfigured with the wrong IP address. A spare unit (S/N 1009) was installed but its IP address was incorrect. Ground teams developed a procedure to reset the IP address via the JSL which was successfully executed today.  Today’s Planned Activities All activities were completed unless otherwise noted. JEM Airlock Slide Table (ST) Extension to JEF side Regenerative ECLSS Recycle Tank Drain Replacement of БРПК 63P USOS Trash Label Plant RNA Regulation/EMCS Procedure Review Columbus Video Camera Assembly 1 (VCA1) Adjustment JEMRMS Small Fine Arm Attachment Mechanism (SAM) Softdock Acoustic Dosimeter Operations – Setup Dosimeter for Static Measurement Plant RNA Regulation/EMCS Experiment Container Removal from Rotor A Crew Medical Officer (CMO) On Board Training (OBT) Plant RNA Regulation/EMCS Rotor A Sample Processing JEM Airlock Slide Table (ST) Retraction from JEF side Plant RNA Regulation/EMCS MELFI Sample Insertion Mating telemetry connectors to БИТС2-12 Plant RNA Regulation/EMCS Experiment Container Removal from Rotor B Replacement of БРПК. Closeout MATRIOSHKA-R. Measurements Plant RNA Regulation/EMCS Rotor B Sample Processing Plant RNA Regulation/EMCS MELFI Sample Insertion Exchange of EMCS TCS Sponge before PRR Run2 Strata Status Check Long Duration Sorbent Testbed Status Check. Treadmill  2 (T2) Yearly Maintenance Quick-disconnect screw clamps (ЗВБ) maintain Health Maintenance System (HMS) Food Frequency Questionnaire (FFQ) Quick-disconnect screw clamps (БЗВ) tightening in MRM1-FGB Hard To Wet Surfaces OBT Review -Monitiring ИП-1 Air Flow Sensors СОЖ Maintenance Delta file prep Metal Oxide (METOX) Regeneration Termination Metal Oxide (METOX) Regeneration Initiation Commercial Generic Bioprocessing Apparatus (CGBA) 4 and 6 Status Check and Maintenance Countermeasures System (CMS) Treadmill 2 (T2) Unmanned Activation and Checkout (ACO) Space Headaches – Weekly Questionnaire Compound Specific Analyzer-Combustion Products (CSA-CP) Extended Maintenance Public Affairs Office (PAO) Event in High Definition (HD) – Lab   Completed Task List Items CCE-Google-Sci Fair Ground Activities All activities were completed unless otherwise noted. JEMRMS installation of NRCSD deployer on slide table Battery 4B1 Reconditioning Three-Day Look Ahead: Saturday, 09/17: Housekeeping, Crew Off Duty Sunday, 09/18: Crew Off Duty Monday, 09/19: Body Measures, HTWS setup, MSL SCA exchange, PWD sample QUICK ISS Status – Environmental Control Group:                               Component Status Elektron Off Vozdukh Manual [СКВ] 1 – SM Air Conditioner System (“SKV1”) Off [СКВ] 2 – SM Air Conditioner System (“SKV2”) Off Carbon Dioxide Removal Assembly (CDRA) Lab Standby Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate Major Constituent Analyzer (MCA) Lab Idle Major Constituent Analyzer (MCA) Node 3 Operate Oxygen Generation Assembly (OGA) Process Urine Processing Assembly (UPA) Reprocess Trace Contaminant Control System (TCCS) Lab Off Trace Contaminant Control System (TCCS) Node 3 Full Up  

from ISS On-Orbit Status Report http://ift.tt/2cMSZxi
via IFTTT

No comments: