European Modular Cultivation System (EMCS) Preparation for Plant Gravity Perception Operations: To prepare the EMCS for the Plant Gravity Perception investigation, the crew replaced the empty EMCS Air Mix Supply Module located on the lower left side of the EMCS holding structure with a full Air Mix Module and then opened the EMCS Gas Valves … Continue reading "ISS Daily Summary Report – 1/26/2018"
from ISS On-Orbit Status Report http://ift.tt/2rMJBWJ
via IFTTT
No comments:
Post a Comment